City of Connell
2025 Crack Seal
Multiple Locations
TIB Award Amount
$108,300
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2026 Small City Maintenance Program (SCMP)

Existing Conditions

Maintenance needs include crack sealing that will ensure the functionality, and longevity of the existing roadways.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 108,300 5,700 114,000
Project Totals $108,300 $5,700 $114,000

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

All cracks will be cleaned and crack filled with hot poured crack sealant per the WSDOT Standard Specifications.