FY 2026 SCMP Selections

Town of Almira
Citywide Maintenance
Multiple Locations
TIB Award Amount
$240,500
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2026 Small City Maintenance Program (SCMP)

Existing Conditions

The entire road network in Almira is in need of crack seal treatment, minus a handful of blocks which were recently treated and have been excluded from this application. Wide cracks (an inch or greater) and significant alligator cracking exists in multiple locations. In addition, pot holes and areas of localized damage exist throughout the network.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 240,500 0 240,500
Project Totals $240,500 $0 $240,500

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Minor cracking throughout the network could be effectively treated with crack seal. Mastic is proposed as a treatment for wider cracks. Patching and rehabilitation is proposed to as a method to fix potholes and localized damage.