Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 SCMP Selections

Town of Northport
2025 Street Maintenance
Multiple Locations
TIB Award Amount
$280,500
Region: East   |   Legislative District: 7   |   Length: 0.00 mi. FY 2026 Small City Maintenance Program (SCMP)

Existing Conditions

Towns local network is starting to show top-down load distresses throughout. Most distresses are alligator cracking, leading to some potholing throughout.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 0 0
Right of Way 0 0 0
Construction 280,500 0 280,500
Project Totals $280,500 $0 $280,500

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Pavement repair and/or overlay patches throughout the network. Additional maintenance solutions may be evaluated and proposed after the 2024-2025 snow season should additional distresses be identified prior to 2025 Construction Season.