Projects — TIB Funding Cycles
FY 2025 SCMP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMany streets are in need of crack sealing to prevent further deterioration |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 31,476 | 0 | 31,476 |
Project Totals | $31,476 | $0 | $31,476 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
Description of Improvements
Crack Sealing, 1/4 cracks, Mastic repair for wider cracks, Pavement repair for potholes