Projects — TIB Funding Cycles
FY 2025 SCMP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Small City Maintenance Program (SCMP) |
![]() |
Existing ConditionsMultiple roadways in need of maintenance. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 0 | 0 | 0 |
Right of Way | 0 | 0 | 0 |
Construction | 67,600 | 0 | 67,600 |
Project Totals | $67,600 | $0 | $67,600 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
Description of Improvements
Minor pavement repair, crack sealing, and fog seal at multiple locations, including: Emma Street (not main highway), Ruby Street, Lee Street, Center Avenue, Missile Base Road/N Weaver Street.