FY 2026 SCAP Selections
|
|
||||
Region: East | Legislative District: 14 | Length: 0.42 mi. | FY 2026 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsThe roadway is in poor condition and lacks pedestrian facilities which results in pedestrians having limited access from this side of the town. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 93,266 | 10,363 | 103,629 |
Right of Way | 0 | 0 | 0 |
Construction | 870,487 | 96,720 | 967,207 |
Project Totals | $963,753 | $107,083 | $1,070,836 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 5% |
Summary of Improvements
Description of Improvements
Project will add sidewalk and compliant ADA ramps as well as reconstruct the roadway.