Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 SCAP Selections

City of Wapato
S Naches Avenue FDR
4th St to 6th St
TIB Award Amount
$535,990
Region: East   |   Legislative District: 14   |   Length: 0.12 mi. FY 2026 Small City Arterial Program (SCAP)

Existing Conditions

The pavement was last assessed in 2022 and was rated 36-40. The pavement shows major signs of subrade failure such as alligator cracking and potholing. There is currently no pedestrian access route or curb ramp accessibility.

Project Funding

  TIB Funds Local Funds Total Costs
Design 61,845 3,255 65,100
Right of Way 0 0 0
Construction 474,145 24,955 499,100
Project Totals $535,990 $28,210 $564,200

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

This project will restore the condition of the roadway through full-depth reclamation, install pedestrian facilities, and provide ADA-compliant curb ramps.