FY 2026 SCAP Selections
|
|
||||
Region: East | Legislative District: 14 | Length: 0.12 mi. | FY 2026 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsThe pavement was last assessed in 2022 and was rated 36-40. The pavement shows major signs of subrade failure such as alligator cracking and potholing. There is currently no pedestrian access route or curb ramp accessibility. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 61,845 | 3,255 | 65,100 |
Right of Way | 0 | 0 | 0 |
Construction | 474,145 | 24,955 | 499,100 |
Project Totals | $535,990 | $28,210 | $564,200 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
This project will restore the condition of the roadway through full-depth reclamation, install pedestrian facilities, and provide ADA-compliant curb ramps.