City of Millwood
Argonne Road Reconstruction - Phase 1
150 ft s/o Frederick to N of Riverway
TIB Award Amount
$125,000
Region: East   |   Legislative District: 4   |   Length: 0.32 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

Argonne Road connects Spokane Valley and Millwood to north Spokane County areas, within the city the road is a primary means to access neighborhoods and business. ADT of 30,000+ with heavy peak hour congestion. Pavement, sidewalks and configuration are poor.

Project Funding

  TIB Funds Local Funds Total Costs
Design 0 397,154 397,154
Right of Way 0 304,249 304,249
Construction 125,000 3,621,944 3,746,944
Project Totals $125,000 $4,323,347 $4,448,347

Local Match

TIB Participation Local Match Minimum Local Match
2.8% 97.2% 5%

Description of Improvements

Reconstruct and widen roadway. Install intersection left turn lanes, construct a shared use path along the east side of the roadway (Empire and the Spokane River bridge; connecting to Millwood Trail).