City of Okanogan
3rd Avenue Improvements
Irene St to Greta St
TIB Award Amount
$1,235,000
Region: East   |   Legislative District: 7   |   Length: 0.30 mi. FY 2025 Small City Arterial Program (SCAP)

Existing Conditions

The existing roadway is deteriorating and does not have any storm drainage facilities or pedestrian facilities. PCR ranged from 50-54 (2023 Data). All parallel routes lack sidewalks, including SR 215.

Project Funding

  TIB Funds Local Funds Total Costs
Design 142,500 7,500 150,000
Right of Way 0 0 0
Construction 1,092,500 57,500 1,150,000
Project Totals $1,235,000 $65,000 $1,300,000

Local Match

TIB Participation Local Match Minimum Local Match
95.0% 5.0% 5%

Description of Improvements

Reconstruct 3rd Avenue from Irene Street to Greta Street. Two 11-foot HMA lanes with rolled curb and gutter on both sides will be installed, with an 8-foot gravel parking lane serving as a buffer for a 5-foot sidewalk. Storm Drainage facilities will also be installed.