Projects — TIB Funding Cycles
FY 2025 SCAP Selections
|
|
||||
Region: East | Legislative District: 7 | Length: 0.21 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsMcEntee Street is a T-5 truck route and sees considerable farm to market truck traffic. The roadway extends into Grant County, ultimately connects to SR-28. McEntee Street condition is poor with alligator cracking between Walnut and Chelan. This section of the roadway also lacks proper stormwater facilities and pedestrian facilities. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 14,324 | 91,776 | 106,100 |
Right of Way | 0 | 0 | 0 |
Construction | 109,877 | 704,023 | 813,900 |
Project Totals | $124,200 | $795,800 | $920,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
13.5% | 86.5% | 0% |
Summary of Improvements
Description of Improvements
Reconstruct roadway, install curb and gutter on both sides, add new sidewalk will be added on one side. It is anticipated that swales will be utilized to infiltrate stormwater and, where possible, the storm drainage system will be connected to the existing storm drain piping on Main Street.