Region: East | Legislative District: 7 | Length: 0.13 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsJonathan Avenue is partially constructed and if extended can complete a portion of the grid network and increasing multimodal access from the developing residential in North Omak. This lack of grid connectivity contributes to traffic congestion on SR 215. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 90,820 | 4,780 | 95,600 |
Right of Way | 4,750 | 250 | 5,000 |
Construction | 696,730 | 36,670 | 733,400 |
Project Totals | $792,300 | $41,700 | $834,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
Extend Jonathan Avenue, constructing a new roadway connecting Quince Street to Pine Street and Oak Street. Construction will consists of 5' sidewalk, 8' parking, 11' travel lane on both sides.