Region: East | Legislative District: 7 | Length: 0.19 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsSpokane Way serves as the shortest route from the Towns of Hartline and Almira to Grand Coulee. The existing roadway has excessive steep banks, cross slopes, horizontal curves and pavement condition. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 13,913 | 97,387 | 111,300 |
Right of Way | 6,250 | 43,750 | 50,000 |
Construction | 106,713 | 746,987 | 853,700 |
Project Totals | $126,875 | $888,125 | $1,015,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
12.5% | 87.5% | 0% |
Summary of Improvements
Description of Improvements
Reconstruct the roadway and realign. Cement treated base will likely be used and stormwater will be collected and conveyed to the existing system.