Region: East | Legislative District: 14 | Length: 0.16 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsN. Ahtanum Road was last assessed by TIB in 2022 and scored a pavement condition rating of 11. A portion of the road, which serves the Emerald Care nursing home, Yakima Valley Farmworkers Medical Clinic, Yakima Fruit and Cold Storage, and Yakima Roche Fruit Storage is mainly composed of gravel. While agriculture is the backbone of the economy in this area, but dust from the large agricultural trucks driving over this road inundates the nursing home facility. The City needs to improve this road to provide access to the aforementioned facilities located along this route. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 93,195 | 4,905 | 98,100 |
Right of Way | 0 | 0 | 0 |
Construction | 714,780 | 37,620 | 752,400 |
Project Totals | $807,975 | $42,525 | $850,500 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
The project will repave the roadway, add or replace the sidewalk, add traffic curb and gutter, and add storm drainage facilities. These upgrades are needed to prevent the road from deteriorating due to stormwater.