Region: East | Legislative District: 7 | Length: 0.16 mi. | FY 2025 Small City Arterial Program (SCAP) |
![]() |
Existing ConditionsRoadway conditions exhibit transverse, longitudinal and alligator cracking; pavement rutting, and areas of asphalt repair patches. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 108,490 | 5,710 | 114,200 |
Right of Way | 0 | 0 | 0 |
Construction | 831,915 | 43,785 | 875,700 |
Project Totals | $940,405 | $49,495 | $989,900 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
Pulverize, regrading, Cement Treated Base (CTB) and pave roadway. Construct two 10 foot wide travel lanes, blubouts, ADA ramps, sidewalk infill and replacement, replacement or new storm drain as needed.