Projects — TIB Funding Cycles
FY 2026 CSP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsMany of the streets in Oakesdale either do not have ADA ramps or non-compliant ADA ramps. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 53,846 | 0 | 53,846 |
Right of Way | 0 | 0 | 0 |
Construction | 346,154 | 0 | 346,154 |
Project Totals | $400,000 | $0 | $400,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
- The project either adds or removes/replaces 30 ADA ramps that are currently barriers for ADA. Most ADA ramps occur on Steptoe and Bartlett.
Description of Improvements
Construct/replace 30 ADA ramps to current standards.