Existing Conditions

This project is the second phase of a city-wide ADA ramp replacement project. The first phase was funded in 2024 under ATP and focused primarily on the east side of Town.

Project Funding

  TIB Funds Local Funds Total Costs
Design 121,840 0 121,840
Right of Way 65,600 0 65,600
Construction 783,290 0 783,290
Project Totals $970,730 $0 $970,730

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

The project either adds or removes/replaces 53 ADA ramps on the west side of Town and removes/replaces approximately 140 upheaved sidewalk panels on River Dr, Central Dr, Camas St, and Tilmus St.