Projects — TIB Funding Cycles
FY 2026 CSP Selections
|
|
||||
Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsThis project is the second phase of a city-wide ADA ramp replacement project. The first phase was funded in 2024 under ATP and focused primarily on the east side of Town. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 121,840 | 0 | 121,840 |
Right of Way | 65,600 | 0 | 65,600 |
Construction | 783,290 | 0 | 783,290 |
Project Totals | $970,730 | $0 | $970,730 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
- The project either adds or removes/replaces 53 ADA ramps on the west side of Town (Engineers City) and removes/replaces approximately 140 upheaved sidewalk panels on streets located near the school (River Dr, Central Dr, Camas St, and Tilmus St).
Description of Improvements
The project either adds or removes/replaces 53 ADA ramps on the west side of Town and removes/replaces approximately 140 upheaved sidewalk panels on River Dr, Central Dr, Camas St, and Tilmus St.