Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 CSP Selections

City of Wenatchee
Bridge Street Multimodal Corridor
S Wenatchee Ave to S Columbia S
TIB Award Amount
$1,263,360
Region: East   |   Legislative District: 12   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

Minimal pavement section with travelled way and on-street parking.

Project Funding

  TIB Funds Local Funds Total Costs
Design 152,160 38,040 190,200
Right of Way 0 0 0
Construction 1,111,200 277,800 1,389,000
Project Totals $1,263,360 $315,840 $1,579,200

Local Match

TIB Participation Local Match Minimum Local Match
80.0% 20.0% 20%

Description of Improvements

The project consists of reconfigured roadway with one-way lane and two-way bicycle track, sidewalks, pedestrian lighting, designated parking, and safety features like RRFBs and ADA-compliant ramps.