Projects — TIB Funding Cycles
FY 2026 CSP Selections
|
|
||||
Region: East | Legislative District: 12 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsMinimal pavement section with travelled way and on-street parking. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 152,160 | 38,040 | 190,200 |
Right of Way | 0 | 0 | 0 |
Construction | 1,111,200 | 277,800 | 1,389,000 |
Project Totals | $1,263,360 | $315,840 | $1,579,200 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
Summary of Improvements
- This will tie into future proposed improvements on S. Wenatchee Ave. that will also include buffered bike lanes, landscaping and wide sidewalks. This project provides access to the Apple Capital loop Trail for South Wenatchee residents, a historically underserved population. Overall, the project seeks to connect vulnerable populations to non-motorized trails, commercial areas, waterfront parks and other recreational areas.
Description of Improvements
The project consists of reconfigured roadway with one-way lane and two-way bicycle track, sidewalks, pedestrian lighting, designated parking, and safety features like RRFBs and ADA-compliant ramps.