Region: East | Legislative District: 3 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsMany of the older elementary and middle schools in Spokane lack the accessible pedestrian facilities that are present at the recently built schools. Marked school crosswalks and other walk routes are missing ADA ramps. In other locations the sidewalk stops and starts along the walk route. Some existing school crosswalks experience higher speed traffic and streets that are wider than needed. Parents often walk kids to and from school with younger siblings in a stroller or on a bike. The lack of ADA ramps provides a barrier and safety concern for anyone using wheels. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 148,563 | 37,141 | 185,704 |
Right of Way | 0 | 0 | 0 |
Construction | 1,488,032 | 372,008 | 1,860,040 |
Project Totals | $1,636,595 | $409,149 | $2,045,744 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
Summary of Improvements
- This project with improve walk routes to Audubon Elementary, Browne Elementary, Garfield Elementary, Indian Trail Elementary, Logan Elementary and Yasuhara Middle School.
Description of Improvements
The project includes school-related ADA ramp installation, sidewalk infill, upgraded crosswalk markings, bumpouts at select locations, and one RRFB at an arterial crosswalk.