Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 CSP Selections

Spokane County
Crestline Street Sidewalks
57th Ave to 63rd Ave
TIB Award Amount
$807,040
Region: East   |   Legislative District: 9   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

Crestline Street is a 50 foot wide Urban Major Collector with an ADT over 11,000. there are no active transportation facilities.

Project Funding

  TIB Funds Local Funds Total Costs
Design 108,800 27,200 136,000
Right of Way 0 0 0
Construction 698,240 179,760 878,000
Project Totals $807,040 $206,960 $1,014,000

Local Match

TIB Participation Local Match Minimum Local Match
79.6% 20.4% 20%

Description of Improvements

Sidewalk and swale for separation from traffic, reduced drive lanes to 11-feet, 7.5-feet of parking on both sides of the road, a RRFB at 57th and Crestline St., and a crosswalk at 63rd Ave.