Projects — TIB Funding Cycles
FY 2026 CSP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsCrestline Street is a 50 foot wide Urban Major Collector with an ADT over 11,000. there are no active transportation facilities. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 108,800 | 27,200 | 136,000 |
Right of Way | 0 | 0 | 0 |
Construction | 698,240 | 179,760 | 878,000 |
Project Totals | $807,040 | $206,960 | $1,014,000 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
79.6% | 20.4% | 20% |
Summary of Improvements
- Complete Streets incorporates context sensitive solutions to community transportation problems by improving safety and mobility., STA bus route 144, the local park, and educational institutions are destinations on the route. ADA improvements create accessibility for all ages and abilities, and narrowing drive lane widths naturally results in slower speeds and will result in a transportation system that meets the needs of the community and particularly children walking to and from school.
Description of Improvements
Sidewalk and swale for separation from traffic, reduced drive lanes to 11-feet, 7.5-feet of parking on both sides of the road, a RRFB at 57th and Crestline St., and a crosswalk at 63rd Ave.