Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 CSP Selections

Town of Twisp
Glover Street Revitalization
5th Ave to Twisp Ave
TIB Award Amount
$2,604,219
Region: East   |   Legislative District: 7   |   Length: 0.00 mi. FY 2026 Complete Streets Program (CSP)

Existing Conditions

Older infrastructure throughout the cooridor that needs to be replaced. Town's primary commercial street.

Project Funding

  TIB Funds Local Funds Total Costs
Design 274,590 26,310 300,900
Right of Way 91,256 8,744 100,000
Construction 2,238,373 214,470 2,452,843
Project Totals $2,604,219 $249,524 $2,853,743

Local Match

TIB Participation Local Match Minimum Local Match
91.3% 8.7% 5%

Description of Improvements

The project enhances downtown with ADA sidewalks, streetscape amenities, traffic calming, bike infrastructure, and canopy replacements, following the disturbance of the funded water line replacement.