Region: East | Legislative District: 7 | Length: 0.00 mi. | FY 2026 Complete Streets Program (CSP) |
![]() |
Existing ConditionsOlder infrastructure throughout the cooridor that needs to be replaced. Town's primary commercial street. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 274,590 | 26,310 | 300,900 |
Right of Way | 91,256 | 8,744 | 100,000 |
Construction | 2,238,373 | 214,470 | 2,452,843 |
Project Totals | $2,604,219 | $249,524 | $2,853,743 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
91.3% | 8.7% | 5% |
Summary of Improvements
- Installing ADA-compliant ramps, and reducing crossing distances to ensure full pedestrian access for people with disabilities. Streetscape Amenities encourage foot traffic and provide community gathering spaces that aid local businesses. This project aims to enhance downtown Twisps walkability and vibrancy.
Description of Improvements
The project enhances downtown with ADA sidewalks, streetscape amenities, traffic calming, bike infrastructure, and canopy replacements, following the disturbance of the funded water line replacement.