Projects — TIB Funding Cycles
FY 2026 ATP Selections
|
|
||||
Region: East | Legislative District: 9 | Length: 1.00 mi. | FY 2026 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsMany of Harringtons ADA ramps are not in compliance with national ADA standards. This application is the first phase of a two phase plan to replace the ADA ramps on the east side of the City. The sidewalks are generally in good condition. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 45,100 | 0 | 45,100 |
Right of Way | 0 | 0 | 0 |
Construction | 349,700 | 0 | 349,700 |
Project Totals | $394,800 | $0 | $394,800 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
100.0% | 0.0% | 0% |
Summary of Improvements
- SE portion of the city will have increased pedestrian accessability.
Description of Improvements
Replace the ADA ramps as indicated on the vicinity map.