Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Funding Cycles

FY 2026 ATP Selections

Town of Metaline Falls
ATP Minimum Speed Feedback Signs
City limits both sides of SR 31
TIB Award Amount
$230,000
Region: East   |   Legislative District: 7   |   Length: 1,500.00 ft. FY 2026 Urban Active Transportation Program (ATP)

Existing Conditions

SR 31 runs through the residential area of Metaline Falls for a distance of about 1/3 mile. There is no notification to the drivers that there is a need to reduce speeds through town, which creates a safety hazard for the residents. Currently SR 31 is posted 25 mph through town, the rest of the town network has a posted speed of 20 mph

Project Funding

  TIB Funds Local Funds Total Costs
Design 20,000 0 20,000
Right of Way 0 0 0
Construction 210,000 0 210,000
Project Totals $230,000 $0 $230,000

Local Match

TIB Participation Local Match Minimum Local Match
100.0% 0.0% 0%

Description of Improvements

Speed feedback signs on both ends of the city limits. Additional signage on the local network to reinforce 20 mph speed limit throughout town, particularly around elementary school and the Cutter performing arts theater. A speed reduction will be requested for SR31 to 20 mph during design.