Region: East | Legislative District: 12 | Length: 1,000.00 ft. | FY 2026 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsOlive Street is a major collector in Cashmere and much of the land (former orchard) has been or is in the process of conversion to residential housing. Sidewalks gaps exist on Olive and Maple streets and concerns exist with crossings at Olive/Chase Intersection which is a walk route. Maple Street is missing a short section of sidewalk that needs to be added. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 56,653 | 2,982 | 59,635 |
Right of Way | 0 | 0 | 0 |
Construction | 593,603 | 31,242 | 624,845 |
Project Totals | $650,256 | $34,224 | $684,480 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
- Maple Street connects Cashmeres biggest and most used park to the adjacent neighborhood and the Central Business District. Olive street is a school walk route.
Description of Improvements
Olive Street: sidewalk infill, mprove stormwater management, add crosswalk with flashing beacons at the Chase Street Intersection. Maple Street: sidewalk infill.