Projects — TIB Funding Cycles
FY 2026 ATP Selections
|
|
||||
Region: East | Legislative District: 8 | Length: 1,411.00 ft. | FY 2026 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsCurrently, there are no sidewalks on the east side of George Washington Way between Comstock Street and Bradley Boulevard. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 113,333 | 28,333 | 141,666 |
Right of Way | 0 | 0 | 0 |
Construction | 736,667 | 184,167 | 920,834 |
Project Totals | $850,000 | $212,500 | $1,062,500 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
80.0% | 20.0% | 20% |
Summary of Improvements
- Improves pedestrian safety;
- Supports economic development;
- Completes gap
Description of Improvements
The proposed project installs an 8-foot-wide sidewalk that will integrate with ADA facilities at Comstock Street and Bradley Boulevard.