Projects — TIB Funding Cycles
FY 2025 ATP Selections
|
|
||||
Region: East | Legislative District: 7 | Length: 800.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsWinthrop does not have a non-vehicular traffic network through the town. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 69,134 | 3,639 | 72,773 |
Right of Way | 0 | 0 | 0 |
Construction | 459,541 | 24,186 | 483,727 |
Project Totals | $528,675 | $27,825 | $556,500 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
95.0% | 5.0% | 5% |
Summary of Improvements
Description of Improvements
This project will connect sidewalk with two prior TIB projects, connecting sidewalks constructed on Bluff Street and Castle Ave.