Region: East | Legislative District: 12 | Length: 420.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsDeficent ADA curb ramps exist throughout the city network. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 42,768 | 4,752 | 47,520 |
Right of Way | 0 | 0 | 0 |
Construction | 235,224 | 26,136 | 261,360 |
Project Totals | $277,992 | $30,888 | $308,880 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
This project aims to reconstruct 28 existing pedestrian curb ramps throughout the city.