Region: East | Legislative District: 4 | Length: 60.00 ft. | FY 2025 Urban Active Transportation Program (ATP) |
![]() |
Existing ConditionsSince 2012, there were 10 veh-ped crashes (1 fatal, 3 serious injury) on this busy commercial corridor wotj 19,400 ADT. The street is 60 feet wide with 5 lanes, has Transit stops for Route 90 serves low-income residential neighborhood as well. |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 51,384 | 19,983 | 71,367 |
Right of Way | 0 | 0 | 0 |
Construction | 428,204 | 166,525 | 594,729 |
Project Totals | $479,589 | $186,507 | $666,096 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
72.0% | 28.0% | 20% |
Summary of Improvements
Description of Improvements
Two new marked crossings with pedestrian refuge islands and rectangular rapid flashing beacon signals are proposed at the mid-way points between the existing signalized intersections at Custer Rd. and at Fancher Rd.