Projects — TIB Funding Cycles
FY 2026 APP Selections
|
|
||||
Region: Northeast | Legislative District: 12 | Length: 0.00 mi. | FY 2026 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 56,421 | 9,957 | 66,378 |
Right of Way | 0 | 0 | 0 |
Construction | 609,346 | 107,531 | 716,877 |
Project Totals | $665,767 | $117,488 | $783,255 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
85.0% | 15.0% | 15% |
Summary of Improvements
Description of Improvements
Grind and overlay full width of roadway, perform pavement repair as needed.