Projects — TIB Funding Cycles
FY 2025 APP Selections
|
|
||||
Region: Northeast | Legislative District: 9 | Length: 0.00 mi. | FY 2025 Arterial Preservation Program (APP) |
![]() |
Existing Conditions |
Project Funding
TIB Funds | Local Funds | Total Costs | |
---|---|---|---|
Design | 152,623 | 16,958 | 169,581 |
Right of Way | 0 | 0 | 0 |
Construction | 1,732,269 | 192,474 | 1,924,743 |
Project Totals | $1,884,891 | $209,433 | $2,094,324 |
Local Match
TIB Participation | Local Match | Minimum Local Match |
---|---|---|
90.0% | 10.0% | 10% |
Summary of Improvements
Description of Improvements
Preservation work includes asphalt patch repairs, crack sealing, curb tapper grinding, asphalt overlay, ADA compliance sidewalk ramps within bulbouts, and street striping.