FY 2025 APP Selections

City of Sunnyside
Yakima Valley Highway Overlay
1st St to 6th St
TIB Award Amount
$425,871
Region: Southeast   |   Legislative District: 15   |   Length: 0.00 mi. FY 2025 Arterial Preservation Program (APP)

Existing Conditions

Project Funding

  TIB Funds Local Funds Total Costs
Design 48,618 5,402 54,020
Right of Way 0 0 0
Construction 377,253 41,917 419,170
Project Totals $425,871 $47,319 $473,190

Local Match

TIB Participation Local Match Minimum Local Match
90.0% 10.0% 10%

Description of Improvements

2" grind and overlay with some widening that will be funded by the City.