There are several roads in the Town that have cracks that need to be sealed to preserve the roadways and prevent premature failures.
Projects — TIB Project Information
TIB Project Information
Town of Cathlamet's 2025 Maintenance Project
2-W-979(003)-1
2-W-979(003)-1
2025 Maintenance Project
Multiple Locations
FY 2026 Small City Preservation Program
Current Phase : Design
Total TIB Funding : $166,000
County: Wahkiakum | Legislative District: 19 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | CATHLAMET |
Funding Year | 2026 |
Program | SCPP |
Current Phase | Design |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Reconstruction |
Project Contact | Jacquelyn Gribble |
Contact Email | projectmanager@townofcathlamet.com |
TIB Engineer | Chris Langhoff |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2024 | |
Delayed Project Date | 07/01/2027 | |
Predesign Approval | ||
Design Approval | 02/01/2025 | 12/18/2024 |
Bid Auth. Approval | 05/01/2025 | |
Construction Approval | 06/01/2025 | |
Project Closeout | 12/01/2025 | |
Audit Date | ||
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 166,000 | 166,000 |
Other Construction | 0 | 0 |
Total Construction | 166,000 | 166,000 |
Total TIB Funding | 166,000 | 166,000 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CATHLAMET | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Crack seal the potential candidate streets of future overlays.Town will investigate using County Forces or Small Works Roster.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |