City of Long Beach's Ocean Beach Boulevard Overlay
2-W-970(003)-1
2-W-970(003)-1
Ocean Beach Boulevard Overlay
Pioneer Rd W to 26th St NW
FY 2024 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Pacific | Legislative District: 19 | Project Length: 0.23 | TIB Engineer: Chris Langhoff | Last Payment Date:
Project Information
Lead Agency | LONG BEACH |
Funding Year | 2024 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.23 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Ariel Smith City Planner |
Contact Email | ASmith@longbeachwa.gov |
TIB Engineer | Chris Langhoff |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
Predesign Approval | ||
Design Approval | 02/01/2023 | 01/12/2023 |
Bid Auth. Approval | 03/15/2024 | |
Construction Approval | 05/01/2024 | |
Project Closeout | 09/15/2024 | |
Audit Date | ||
Withdrawn Date | 03/01/2024 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 10,450 | 11,000 |
Right of Way | 0 | 0 |
Total Design | 10,450 | 11,000 |
Construction Engineering | 14,250 | 15,000 |
Construction Contract | 180,215 | 189,700 |
Other Construction | 0 | 0 |
Total Construction | 194,465 | 204,700 |
Total TIB Funding | 0 | 215,700 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
LONG BEACH | 10,785 | 5.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 10,785 | 5.0% |
Project Description
2 inch overlay of Ocean Beach Boulevard - Pioneer Rd W to 26th St NW
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |