Cracking of asphalt pavement and some pot holes
Projects — TIB Project Information
TIB Project Information
City of Castle Rock's 2024 Street Maintenance
2-W-952(008)-1
2-W-952(008)-1
2024 Street Maintenance
Multiple Locations
FY 2025 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $47,500
County: Cowlitz | Legislative District: 19 | Project Length: 0.00 | TIB Engineer: Chris Langhoff | Last Payment Date: 10/31/2024
Project Information
Lead Agency | CASTLE ROCK |
Funding Year | 2025 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 19 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.00 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | David Vorse |
Contact Email | crpwd@ci.castle-rock.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 10/31/2024 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/01/2023 | |
Delayed Project Date | 07/01/2026 | |
Predesign Approval | ||
Design Approval | 02/29/2024 | 02/14/2024 |
Bid Auth. Approval | 05/15/2024 | 02/14/2024 |
Construction Approval | 06/01/2024 | 06/18/2024 |
Project Closeout | 10/31/2024 | 10/17/2024 |
Audit Date | 10/31/2024 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 47,500 | 68,875 |
Other Construction | 0 | 10,774 |
Total Construction | 47,500 | 79,649 |
Total TIB Funding | 47,500 | 79,649 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CASTLE ROCK | 32,149 | 40.4% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 32,149 | 40.4% |
Project Description
Sealing cracks and minor patching of pot holes and areas that are too cracked up.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |