Cracks needs to be sealed and areas that are too cracked up need to be removed and patched.
Projects — TIB Project Information
TIB Project Information
City of Castle Rock's 2021 Small City Maintenance
2-W-952(007)-1
2-W-952(007)-1
2021 Small City Maintenance
Multiple Locations
FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $34,926
County: Cowlitz | Legislative District: 20 | Project Length: 0.10 | TIB Engineer: Chris Langhoff | Last Payment Date: 11/15/2022
Project Information
Lead Agency | CASTLE ROCK |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 20 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.10 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | David Vorse |
Contact Email | crpwd@ci.castle-rock.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 11/15/2022 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/29/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 07/15/2022 | 06/28/2022 |
Bid Auth. Approval | 07/15/2022 | 06/28/2022 |
Construction Approval | 07/15/2022 | 06/28/2022 |
Project Closeout | 09/30/2022 | 11/02/2022 |
Audit Date | 11/15/2022 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 24,926 | 33,912 |
Other Construction | 0 | 8,854 |
Total Construction | 24,926 | 42,766 |
Funding Increase | 10,000 | |
Total TIB Funding | 34,926 | 42,766 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
CASTLE ROCK | 7,840 | 18.3% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 7,840 | 18.3% |
Project Description
We propose to seal cracks with appropriate sealer material and cut/grinding and remove the areas that are to cracked up and patch back with permanent asphalt material.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |