Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

City of Castle Rock's 2021 Small City Maintenance

2-W-952(007)-1

2-W-952(007)-1
2021 Small City Maintenance

Multiple Locations

FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $34,926

County: Cowlitz   |   Legislative District: 20   |   Project Length: 0.10   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 11/15/2022

Project Information

Lead Agency CASTLE ROCK
Funding Year 2023
Program SCPP
Current Phase Audit
Legislative District 20
Congressional District 3
Federal Route Number 9999
Project Length 0.10 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact David Vorse
Contact Email crpwd@ci.castle-rock.wa.us
TIB Engineer Chris Langhoff
Last Payment Date 11/15/2022

Project Schedule

  Target Date Actual Date
Project Selection Date   11/29/2021
Delayed Project Date 07/01/2024  
Predesign Approval
Design Approval 07/15/2022 06/28/2022
Bid Auth. Approval 07/15/2022 06/28/2022
Construction Approval 07/15/2022 06/28/2022
Project Closeout 09/30/2022 11/02/2022
Audit Date   11/15/2022
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 24,926 33,912
Other Construction 0 8,854
Total Construction 24,926 42,766
     
Funding Increase 10,000  
Total TIB Funding 34,926 42,766

Local Funding Partners

Funding Amount Percent
CASTLE ROCK 7,840 18.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 7,840 18.3%

Project Description

We propose to seal cracks with appropriate sealer material and cut/grinding and remove the areas that are to cracked up and patch back with permanent asphalt material.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments