The PCR rating for the selected segment is as follows S 56th Place - S 1st Circle to S 6th Way 45
Projects — TIB Project Information
TIB Project Information
City of Ridgefield's FY 2014 Overlay Project
2-W-950(002)-1
2-W-950(002)-1
FY 2014 Overlay Project
Multiple Locations
FY 2014 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $158,903
County: Clark | Legislative District: 18 | Project Length: 0.27 | TIB Engineer: Chris Langhoff | Last Payment Date: 03/16/2015
Project Information
Lead Agency | RIDGEFIELD |
Funding Year | 2014 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 18 |
Congressional District | 3 |
Federal Route Number | 9999 |
Project Length | 0.27 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Bryan Kast |
Contact Email | bryan.kast@ci.ridgefield.wa.us |
TIB Engineer | Chris Langhoff |
Last Payment Date | 03/16/2015 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2012 | |
Delayed Project Date | 07/01/2015 | |
Predesign Approval | ||
Design Approval | 01/01/2013 | 04/29/2013 |
Bid Auth. Approval | 06/01/2014 | 03/25/2014 |
Construction Approval | 04/25/2014 | 04/24/2014 |
Project Closeout | 04/01/2015 | 03/05/2015 |
Audit Date | 03/16/2015 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 13,500 | 0 |
Right of Way | 0 | 0 |
Total Design | 13,500 | 0 |
Construction Engineering | 9,720 | 0 |
Construction Contract | 121,905 | 176,559 |
Other Construction | 0 | 0 |
Total Construction | 131,625 | 176,559 |
Funding Increase | 21,645 | |
Funding Surplus | - 7,867 | |
Total TIB Funding | 158,903 | 176,559 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
RIDGEFIELD | 17,656 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 17,656 | 10.0% |
Project Description
This project will repair failed areas of pavement and place a 2 inch overlay on S. 56th Place from S. 1st Circle to S. 6th Way. There are 2 sidewalk ramps that will be reconstructed to meet current standards.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |