City of Ridgefield's FY 2012 Overlay Project

2-W-950(001)-1

2-W-950(001)-1
FY 2012 Overlay Project

Multiple Locations

FY 2012 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $136,572

County: Clark   |   Legislative District: 18   |   Project Length: 0.76   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 10/15/2014

Project Information

Lead Agency RIDGEFIELD
Funding Year 2012
Program SCPP
Current Phase Audit
Legislative District 18
Congressional District 3
Federal Route Number D061
Project Length 0.76 mi.
ADT 100
Functional Class Collector
Type of Work Resurfacing
Project Contact Bryan Kast
Contact Email bryan.kast@ci.ridgefield.wa.us
TIB Engineer Chris Langhoff
Last Payment Date 10/15/2014

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2010
Delayed Project Date 07/01/2013  
Predesign Approval
Design Approval 04/01/2011 03/23/2011
Bid Auth. Approval 05/01/2011 03/23/2011
Construction Approval 04/01/2013 12/03/2012
Project Closeout 08/15/2014 10/06/2014
Audit Date   10/15/2014
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 7,840 16,903
Right of Way 0 0
Total Design 7,840 16,903
     
Construction Engineering 7,840 8,505
Construction Contract 88,670 516,114
Other Construction 0 0
Total Construction 96,510 524,619
     
Funding Increase 32,222  
Total TIB Funding 136,572 541,522

Local Funding Partners

Funding Amount Percent
RIDGEFIELD 139,828 25.8%
WSDOT Funding 0 0.0%
STP  265,122 49.0%
 
 
 
 
 
 
 
Total Local Funding 404,950 74.8%

Project Description

This project will rubblize and overlay 85th Ave between S 5th Avenue and the north city limits providing a 2-inch overlay and geotextile fabric.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments