City of Nooksack's FY 2014 Overlay Project

2-W-840(002)-1

2-W-840(002)-1
FY 2014 Overlay Project

Multiple Locations

FY 2014 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Whatcom   |   Legislative District: 42   |   Project Length: 0.26   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency NOOKSACK
Funding Year 2014
Program SCPP
Current Phase Withdrawn
Legislative District 42
Congressional District 1
Federal Route Number 37BZ
Project Length 0.26 mi.
ADT 0
Functional Class Collector
Type of Work Resurfacing
Project Contact Bruce Likkel
Contact Email bruce@cityofnooksack.com
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2012
Delayed Project Date 07/01/2015  
Predesign Approval
Design Approval 01/01/2013
Bid Auth. Approval 06/01/2013
Construction Approval 07/01/2013
Project Closeout 10/31/2013
Audit Date  
Withdrawn Date   12/07/2012

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
NOOKSACK 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

The project will grind, prelevel and provide a 2-inch overlay of E Madison Street between SR 9 and E 4th St. In addition, 6 ADA ramps will be upgarde.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.