Town of Hamilton's FY 2014 Red Town Project

2-W-833(002)-1

2-W-833(002)-1
FY 2014 Red Town Project

Multiple Locations

FY 2014 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0

County: Skagit   |   Legislative District: 39   |   Project Length: 0.68   |   TIB Engineer: Chris Langhoff   |   Last Payment Date:

Project Information

Lead Agency HAMILTON
Funding Year 2014
Program SCPP
Current Phase Withdrawn
Legislative District 39
Congressional District 1
Federal Route Number 9999
Project Length 0.68 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Joan Cromley
Contact Email townofhamilton.2010@gmail.com
TIB Engineer Chris Langhoff
Last Payment Date

Project Schedule

  Target Date Actual Date
Project Selection Date   11/16/2012
Delayed Project Date 07/01/2015  
Predesign Approval
Design Approval 02/28/2013
Bid Auth. Approval 06/01/2013
Construction Approval 07/01/2013
Project Closeout 10/31/2013
Audit Date  
Withdrawn Date   02/22/2013

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 0 0
Other Construction 0 0
Total Construction 0 0
     
Total TIB Funding 0 0

Local Funding Partners

Funding Amount Percent
HAMILTON 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

This project will prelevel and provide a 2 inch overlay of the following Streets Pettit Street, Maple Street, Railroad Avenue, Nolle Avenue and California Street. In addition small areas of base failure will be dug out and repaired.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments