Town of Concrete's FY 2010 Sidewalk Maintenance Project

2-W-832(002)-1

2-W-832(002)-1
FY 2010 Sidewalk Maintenance Project

Multiple Locations

FY 2010 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $92,303

County: Skagit   |   Legislative District: 39   |   Project Length: 0.00   |   TIB Engineer: Chris Langhoff   |   Last Payment Date: 11/16/2011

Project Information

Lead Agency CONCRETE
Funding Year 2010
Program SCPP
Current Phase Audit
Legislative District 39
Congressional District 1
Federal Route Number 29CN
Project Length 0.00 mi.
ADT 200
Functional Class TIB Arterial
Type of Work Pedestrian
Project Contact Andrea Fichter
Contact Email andreaf@concretewa.gov
TIB Engineer Chris Langhoff
Last Payment Date 11/16/2011

Project Schedule

  Target Date Actual Date
Project Selection Date   11/21/2008
Delayed Project Date 07/01/2011  
Predesign Approval
Design Approval 01/01/2009 01/21/2009
Bid Auth. Approval 01/01/2009 01/21/2009
Construction Approval 08/31/2009 10/21/2009
Project Closeout 10/31/2011 11/04/2011
Audit Date   11/16/2011
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 17,025
Right of Way 0 0
Total Design 0 17,025
     
Construction Engineering 0 20,012
Construction Contract 100,000 55,266
Other Construction 0 0
Total Construction 100,000 75,278
     
Funding Surplus - 7,697  
Total TIB Funding 92,303 92,303

Local Funding Partners

Funding Amount Percent
CONCRETE 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

Replace sidewalk along Main Street.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.