City of Sultan's FY 2009 Sidewalk Maintenance Project
2-P-824(001)-1
2-P-824(001)-1
FY 2009 Sidewalk Maintenance Project
Multiple Locations
FY 2009 Small City Preservation Program
Current Phase : Withdrawn
Total TIB Funding : $0
County: Snohomish | Legislative District: 39 | Project Length: 275.00 | TIB Engineer: Greg Armstrong | Last Payment Date:
Project Information
Lead Agency | SULTAN |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Withdrawn |
Legislative District | 39 |
Congressional District | 1 |
Federal Route Number | 9999 |
Project Length | 275.00 mi. |
ADT | 50 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Jon Stack |
Contact Email | jon.stack@ci.sultan.wa.us |
TIB Engineer | Greg Armstrong |
Last Payment Date |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | 01/31/2008 | 02/04/2008 |
Bid Auth. Approval | 04/30/2008 | 02/04/2008 |
Construction Approval | 05/31/2008 | |
Project Closeout | 11/30/2008 | |
Audit Date | ||
Withdrawn Date | 09/09/2008 |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 0 | 0 |
Other Construction | 0 | 0 |
Total Construction | 0 | 0 |
Total TIB Funding | 0 | 0 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
SULTAN | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
Repair the sidewalk along both sides of 6th Street between Main Street and the north end.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |