The Pavement Condition Ratings of the follow segments 1st Avenue W from 1st St to Smeltzer Rd 54 415th Avenue SE from SR 2 to 419th Ave SE 59 Dorman Road From SR 2 to BNSF Railroad Tracks 54
Projects — TIB Project Information
TIB Project Information
City of Gold Bar's 2022 Overlay Award
2-P-819(006)-1
2-P-819(006)-1
2022 Overlay Award
Multiple Locations
FY 2024 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $278,450
County: Snohomish | Legislative District: 39 | Project Length: 0.72 | TIB Engineer: Greg Armstrong | Last Payment Date: 10/31/2023
Project Information
Lead Agency | GOLD BAR |
Funding Year | 2024 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 39 |
Congressional District | 1 |
Federal Route Number | 9999 |
Project Length | 0.72 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Rich Norris |
Contact Email | r.norris@cityofgoldbar.us |
TIB Engineer | Greg Armstrong |
Last Payment Date | 10/31/2023 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 12/02/2022 | |
Delayed Project Date | 07/01/2025 | |
Predesign Approval | ||
Design Approval | 02/01/2023 | 12/12/2022 |
Bid Auth. Approval | 05/15/2023 | 04/11/2023 |
Construction Approval | 05/10/2023 | 05/08/2023 |
Project Closeout | 10/31/2023 | 10/19/2023 |
Audit Date | 10/31/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 57,876 | 45,824 |
Right of Way | 0 | 0 |
Total Design | 57,876 | 45,824 |
Construction Engineering | 28,938 | 21,693 |
Construction Contract | 318,317 | 225,434 |
Other Construction | 0 | 0 |
Total Construction | 347,255 | 247,127 |
Funding Surplus | - 126,681 | |
Total TIB Funding | 278,450 | 292,951 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GOLD BAR | 14,501 | 4.9% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 14,501 | 4.9% |
Project Description
This project grinds and provides a 2-inch overlay of the follow segments 1st Avenue W from 1st St to Smeltzer Rd 415th Avenue SE from SR 2 to 419th Ave SE Dorman Road From SR 2 to BNSF Railroad Tracks
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |