Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Beaux Arts's 104th105th Pavement Preservation

2-P-123(001)-1

2-P-123(001)-1
104th105th Pavement Preservation

North Town limit to SE 30th

FY 2026 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $124,226

County: King   |   Legislative District: 41   |   Project Length: 1.00   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 01/29/2025

Project Information

Lead Agency BEAUX ARTS VILLAGE
Funding Year 2026
Program SCPP
Current Phase Audit
Legislative District 41
Congressional District 9
Federal Route Number 9999
Project Length 1.00 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Brad Wheeler
Contact Email bwheeler@beauxarts-wa.gov
TIB Engineer Greg Armstrong
Last Payment Date 01/29/2025

Project Schedule

  Target Date Actual Date
Project Selection Date   08/08/2024
Delayed Project Date 07/01/2027  
Predesign Approval
Design Approval 08/15/2024 08/12/2024
Bid Auth. Approval 08/15/2024 08/12/2024
Construction Approval 08/15/2024 08/12/2024
Project Closeout 06/30/2025 01/24/2025
Audit Date   01/29/2025
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 12,656
Construction Contract 195,271 118,108
Other Construction 0 0
Total Construction 195,271 130,764
     
Funding Surplus - 71,045  
Total TIB Funding 124,226 130,764

Local Funding Partners

Funding Amount Percent
BEAUX ARTS VILLAGE 6,538 5.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 6,538 5.0%

Project Description

The alligatored sections of pavement will be removed and replaced with a heavier road section including a crushed surfacing base layer and two lifts of HMA pavement patch.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments