City of Medina's NE 7th Street Overlay

2-P-109(003)-1

2-P-109(003)-1
NE 7th Street Overlay

84th Ave NE to Overlake Dr

FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $140,656

County: King   |   Legislative District: 48   |   Project Length: 0.32   |   TIB Engineer: Greg Armstrong   |   Last Payment Date: 12/01/2022

Project Information

Lead Agency MEDINA
Funding Year 2023
Program SCPP
Current Phase Audit
Legislative District 48
Congressional District 1
Federal Route Number 9999
Project Length 0.32 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Ryan Osada
Contact Email rosada@medina-wa.gov
TIB Engineer Greg Armstrong
Last Payment Date 12/01/2022

Project Schedule

  Target Date Actual Date
Project Selection Date   11/19/2021
Delayed Project Date 07/01/2024  
Predesign Approval
Design Approval 02/01/2022 11/29/2021
Bid Auth. Approval 06/15/2022 06/15/2022
Construction Approval 06/29/2022 07/05/2022
Project Closeout 11/30/2022 11/21/2022
Audit Date   12/01/2022
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 11,118 13,333
Right of Way 0 0
Total Design 11,118 13,333
     
Construction Engineering 18,530 3,220
Construction Contract 185,300 148,925
Other Construction 0 0
Total Construction 203,830 152,145
     
Funding Surplus - 74,292  
Total TIB Funding 140,656 165,478

Local Funding Partners

Funding Amount Percent
MEDINA 24,822 15.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 24,822 15.0%

Project Description

Grind and 2-inch overlay of NE 7th Street from 84th Ave NE to Overlake Dr.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.