Current Phase : Audit
Total TIB Funding : $79,444
County: Whitman | Legislative District: 9 | Project Length: 2,200.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 10/26/2007
Project Information
Lead Agency | COLFAX |
Funding Year | 2008 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 9 |
Congressional District | 5 |
Federal Route Number | 9999 |
Project Length | 2200.00 mi. |
ADT | 500 |
Functional Class | Collector |
Type of Work | Resurfacing |
Project Contact | Andy Rogers |
Contact Email | arogers@ci.colfax.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 10/26/2007 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 07/03/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | ||
Bid Auth. Approval | 07/03/2007 | 07/03/2007 |
Construction Approval | 07/15/2007 | 07/15/2007 |
Project Closeout | 10/31/2007 | 10/26/2007 |
Audit Date | 10/26/2007 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 98,000 | 79,444 |
Other Construction | 0 | 0 |
Total Construction | 98,000 | 79,444 |
Funding Surplus | - 18,556 | |
Total TIB Funding | 79,444 | 79,444 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
COLFAX | 0 | 0.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 0 | 0.0% |
Project Description
The project provides a 2-in overlay of the roadway surface and repairs sidewalk, curb and gutter. The scope includes constructing ADA ramps at three locations.
Existing Condition
Project Benefits
- Restores roadway surface;
- Rehabilitates sidewalk and curb
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |