The pavement condition rating of the segments is as follow Chenaur Drive - Adam Park Dr to Sunset Way 45 Sunset Way - Chenaur Dr to Second Ave 50 Sunset Way - Chenaur Dr to Kagley Way 50 Birch Street - Ann St to Miles Dr 50 Walnut Street - Ann St to Miles Dr 50
Projects — TIB Project Information
TIB Project Information
City of Zillah's 2021 Overlay
2-E-947(004)-1
2-E-947(004)-1
2021 Overlay
Multiple Locations
FY 2023 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $254,685
County: Yakima | Legislative District: 15 | Project Length: 0.42 | TIB Engineer: Jonathan Heusman | Last Payment Date: 01/17/2023
Project Information
Lead Agency | ZILLAH |
Funding Year | 2023 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.42 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Ardele Steele |
Contact Email | Asteele@cityofzillah.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 01/17/2023 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/19/2021 | |
Delayed Project Date | 07/01/2024 | |
Predesign Approval | ||
Design Approval | 02/01/2022 | 12/10/2021 |
Bid Auth. Approval | 04/05/2022 | 03/30/2022 |
Construction Approval | 04/30/2022 | 05/03/2022 |
Project Closeout | 12/01/2022 | 01/05/2023 |
Audit Date | 01/17/2023 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 29,160 | 32,307 |
Right of Way | 0 | 0 |
Total Design | 29,160 | 32,307 |
Construction Engineering | 29,160 | 29,372 |
Construction Contract | 193,936 | 220,689 |
Other Construction | 0 | 616 |
Total Construction | 223,096 | 250,677 |
Funding Increase | 2,429 | |
Total TIB Funding | 254,685 | 282,984 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
ZILLAH | 28,299 | 10.0% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 28,299 | 10.0% |
Project Description
Prelevel and 2-inch overlay of the following segments Chenaur Drive - Adam Park Dr to Sunset Way Sunset Way - Chenaur Dr to Kagley Wy Sunset Way - Chanaur Dr to 2nd Ave Birsh St - Ann St to Miles Dr Walnut St - Ann St to Miles Dr
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |