City of Wapato's FY 2013 Overlay Project

2-E-946(002)-1

2-E-946(002)-1
FY 2013 Overlay Project

Multiple Locations

FY 2013 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $359,889

County: Yakima   |   Legislative District: 15   |   Project Length: 0.39   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 01/07/2013

Project Information

Lead Agency WAPATO
Funding Year 2013
Program SCPP
Current Phase Audit
Legislative District 15
Congressional District 4
Federal Route Number 9999
Project Length 0.39 mi.
ADT 349
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Gary Potter
Contact Email gpotter@wapato-city.org
TIB Engineer Jonathan Heusman
Last Payment Date 01/07/2013

Project Schedule

  Target Date Actual Date
Project Selection Date   11/18/2011
Delayed Project Date 07/01/2014  
Predesign Approval
Design Approval 01/01/2012 01/24/2012
Bid Auth. Approval 05/01/2012 01/24/2012
Construction Approval 07/02/2012 07/03/2012
Project Closeout 12/31/2012 12/21/2012
Audit Date   01/07/2013
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 40,500 30,000
Right of Way 0 0
Total Design 40,500 30,000
     
Construction Engineering 27,000 43,827
Construction Contract 202,500 346,062
Other Construction 0 0
Total Construction 229,500 389,889
     
Funding Increase 91,503  
Funding Surplus - 1,614  
Total TIB Funding 359,889 419,889

Local Funding Partners

Funding Amount Percent
WAPATO 60,000 14.3%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 60,000 14.3%

Project Description

The following street were selected to be overlayed 3rd Satus to Wasco Status 2nd to 5th Wasco 1st to 3rd

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.