Several sections of existing sidewalk and adjacent ADA ramps are in a deteriorated state.
Projects — TIB Project Information
TIB Project Information
City of Moxee's FY 2009 Sidewalk Maintenance Project
2-E-943(002)-1
2-E-943(002)-1
FY 2009 Sidewalk Maintenance Project
Multiple Locations
FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $7,712
County: Yakima | Legislative District: 15 | Project Length: 144.00 | TIB Engineer: Jonathan Heusman | Last Payment Date: 03/17/2010
Project Information
Lead Agency | MOXEE |
Funding Year | 2009 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 144.00 mi. |
ADT | 250 |
Functional Class | Local Access |
Type of Work | Pedestrian |
Project Contact | Byron Adams |
Contact Email | byronadams@charter.net |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 03/17/2010 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/16/2007 | |
Delayed Project Date | 07/01/2010 | |
Predesign Approval | ||
Design Approval | 01/01/2008 | 09/09/2008 |
Bid Auth. Approval | 01/01/2008 | 09/09/2008 |
Construction Approval | 02/25/2010 | 02/25/2010 |
Project Closeout | 04/30/2010 | 03/17/2010 |
Audit Date | 03/17/2010 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 0 | 0 |
Right of Way | 0 | 0 |
Total Design | 0 | 0 |
Construction Engineering | 0 | 0 |
Construction Contract | 7,712 | 8,102 |
Other Construction | 0 | 0 |
Total Construction | 7,712 | 8,102 |
Total TIB Funding | 7,712 | 8,102 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
MOXEE | 390 | 4.8% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 390 | 4.8% |
Project Description
This project will repair 144 feet of existing sidewalk and install ADA ramps as needed along the west side of South Holly Drive between Moxee Avenue and Holly Place.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |