Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Harrah's E Pioneer St

2-E-941(001)-1

2-E-941(001)-1
E Pioneer St

Harrah Rd to Falen Ave

FY 2009 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $14,913

County: Yakima   |   Legislative District: 14   |   Project Length: 0.01   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 11/04/2008

Project Information

Lead Agency HARRAH
Funding Year 2009
Program SCPP
Current Phase Audit
Legislative District 14
Congressional District 4
Federal Route Number 9999
Project Length 0.01 mi.
ADT 250
Functional Class Local Access
Type of Work Resurfacing
Project Contact Barbara Harrer
Contact Email
TIB Engineer Jonathan Heusman
Last Payment Date 11/04/2008

Project Schedule

  Target Date Actual Date
Project Selection Date   10/22/2008
Delayed Project Date 07/01/2011  
Predesign Approval
Design Approval
Bid Auth. Approval 08/17/2008 08/17/2008
Construction Approval 08/17/2008 08/17/2008
Project Closeout 08/21/2008 10/31/2008
Audit Date   11/04/2008
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 14,913 16,003
Other Construction 0 0
Total Construction 14,913 16,003
     
Total TIB Funding 14,913 16,003

Local Funding Partners

Funding Amount Percent
HARRAH 1,090 6.8%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 1,090 6.8%

Project Description

The drain will be repaired and the sink hole will be excavated and back filled with dry material. The roadway surface will be restored as needed.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments