The Pavement Condition Rating of Mentzer Avenue is 49
Projects — TIB Project Information
TIB Project Information
Town of Granger's FY 2021 Overlay Project
2-E-940(007)-1
2-E-940(007)-1
FY 2021 Overlay Project
Multiple Locations
FY 2021 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $269,492
County: Yakima | Legislative District: 15 | Project Length: 0.45 | TIB Engineer: Jonathan Heusman | Last Payment Date: 01/14/2021
Project Information
Lead Agency | GRANGER |
Funding Year | 2021 |
Program | SCPP |
Current Phase | Audit |
Legislative District | 15 |
Congressional District | 4 |
Federal Route Number | 9999 |
Project Length | 0.45 mi. |
ADT | 0 |
Functional Class | TIB Arterial |
Type of Work | Resurfacing |
Project Contact | Jodie Luke |
Contact Email | jluke.grangerpw@co.yakima.wa.us |
TIB Engineer | Jonathan Heusman |
Last Payment Date | 01/14/2021 |
Project Schedule
Target Date | Actual Date | |
---|---|---|
Project Selection Date | 11/22/2019 | |
Delayed Project Date | 07/01/2022 | |
Predesign Approval | ||
Design Approval | 02/01/2020 | 12/11/2019 |
Bid Auth. Approval | 06/01/2020 | 04/14/2020 |
Construction Approval | 06/30/2020 | 05/15/2020 |
Project Closeout | 10/31/2020 | 01/06/2021 |
Audit Date | 01/14/2021 | |
Withdrawn Date |
Project Funding
TIB Funds | Project Costs | |
---|---|---|
Environmental Study | 0 | 0 |
Design Study | 0 | 0 |
Total Predesign | 0 | 0 |
Special Study | 0 | 0 |
Design | 37,630 | 39,611 |
Right of Way | 0 | 0 |
Total Design | 37,630 | 39,611 |
Construction Engineering | 43,425 | 30,475 |
Construction Contract | 289,465 | 218,213 |
Other Construction | 0 | 0 |
Total Construction | 332,890 | 248,688 |
Funding Surplus | - 101,028 | |
Total TIB Funding | 269,492 | 288,299 |
Local Funding Partners
Funding Amount | Percent | |
---|---|---|
GRANGER | 18,807 | 6.5% |
WSDOT Funding | 0 | 0.0% |
Total Local Funding | 18,807 | 6.5% |
Project Description
The City will plane the roadway and overlay Mentzer Avenue between 2nd Avenue and 'E' Avenue replace seven non-compliant ADA ramps, a small section of sidewalk, and associated curb and gutter and make minor adjustments to utilities including manholes, valve boxes, and monument cases and covers.
Existing Condition
Project Benefits
Project Delays
Delay Type | Resolution Date | Comments |
---|---|---|
No delayed project history. |