Transportation Improvement Board
Performance Management Dashboard

 Projects — TIB Project Information

TIB Project Information

Town of Granger's FY 2019 Seal Coat Project

2-E-940(005)-1

2-E-940(005)-1
FY 2019 Seal Coat Project

Multiple Locations

FY 2019 Small City Preservation Program
Current Phase : Audit
Total TIB Funding : $29,037

County: Yakima   |   Legislative District: 15   |   Project Length: 1.07   |   TIB Engineer: Jonathan Heusman   |   Last Payment Date: 12/12/2018

Project Information

Lead Agency GRANGER
Funding Year 2019
Program SCPP
Current Phase Audit
Legislative District 15
Congressional District 4
Federal Route Number 9999
Project Length 1.07 mi.
ADT 0
Functional Class TIB Arterial
Type of Work Resurfacing
Project Contact Jodie Luke
Contact Email JLuke.grangerpw@co.yakima.wa.us
TIB Engineer Jonathan Heusman
Last Payment Date 12/12/2018

Project Schedule

  Target Date Actual Date
Project Selection Date   11/17/2017
Delayed Project Date 07/01/2020  
Predesign Approval
Design Approval 01/01/2018 01/29/2018
Bid Auth. Approval 04/01/2018 01/29/2018
Construction Approval 05/01/2018 01/29/2018
Project Closeout 01/31/2019 12/04/2018
Audit Date   12/12/2018
Withdrawn Date  

Project Funding

TIB Funds Project Costs
Environmental Study 0 0
Design Study 0 0
Total Predesign 0 0
     
Special Study 0 0
Design 0 0
Right of Way 0 0
Total Design 0 0
     
Construction Engineering 0 0
Construction Contract 62,624 29,037
Other Construction 0 0
Total Construction 62,624 29,037
     
Funding Surplus - 33,587  
Total TIB Funding 29,037 29,037

Local Funding Partners

Funding Amount Percent
GRANGER 0 0.0%
WSDOT Funding 0 0.0%
 
 
 
 
 
 
 
 
Total Local Funding 0 0.0%

Project Description

There are no digouts, crack seal, or prelevel anticipated. There were numerous segments that needed additional work done to them, those were checked to not be funded.

Project Pictures

Project Delays

Delay Type Resolution Date Comments

No delayed project history.

Project Payments